Featured Projects
Providing the full range of electrical contracting services since 1985
As a large, versatile team of experienced electrical contractors, Reliance Electric has provided our services to large-scale projects all over the United States. We’ve cultivated close relationships with many of the general contractors and project owners we work with, so when they want the best work and the best team, they call us.
Copper Stone Apartments
Owner:
Copper Stone Apartments
General Contractor:
Brinkman Construction
Completed:
12/15/2017
Duration:
15 months (2 months ahead of schedule)Scope:
- 3 Stories
- 260 rooms
- 318,853 sq. ft.
Testimonial from the GC:
"The name Reliance speaks volumes on your company’s phenomenal performance and ethics through all facets of construction, from the field side to administration. All projects have some level of contractor problems and issues. The knowledge and comfort level that your firm can be ‘relied’ upon to perform well and on time is massive and well appreciated. Coupled with on-point administration, makes Reliance Electric a complete proven performer"
Grant Macdonald, Project Manager, Brinkman Construction
Legacy Village
Owner:
Legacy Village of Castle Pines
General Contractor:
Shaw Construction
Completed:
7/20/2018
Duration:
18 Months
Scope:
- 177 rooms
- Installation of State of the Ark Voice Evacuation System
- Installation of emergency generator backup system
Notes:
Legacy Village offers independent care, assisted care, and memory care.
Limelight Village
Owner:
East West Partners
General Contractor:
RA Nelson, LLC
Completed:
02/20/2019
Duration:
19 Months
Scope:
- 5 stories, 123 rooms 104,201 sq. ft.
- Installation of Energy Management System in all guest rooms
- Installation of lighting control throughout the common area and ice rink outbuilding
Notes:
Unique to this project is that the top floor of the building has seven condominiums. All other floors are hotel rooms. We were able to help meet the temporary COI date on this facility. This is the only ice rink we have done electrical for.
Marriott Towneplace Suites
Element Hotel
Owner:
Tukwila Hotel Group - John Braxton
General Contractor:
Key Construction
Completed:
5/31/2021
Duration:
26 months
Scope:
- 5 levels, 177 rooms, 116,665 sq. ft.
- Installation of lighting control system
- Installation of emergency generator
Notes:
This hotel had a very complex smoke control system that was included in the scope of work.
Residence Inn
Fairfield Inn
Owner:
Canyonland Lodging, LLC
General Contractor:
Richard Van Leeuwen, LLC
Completed:
12/20/2014
Duration:
12 months
Scope:
- Low-voltage electrical
- Water treatment facility
- Installation of backup generator
Hampton Inn
Owner:
Queen Creek Hospitality Group, LLC
General Contractor:
Porter Brothers
Completed:
1/20/2021
Duration:
17 months
Scope:
- 4 levels, 110 rooms, 62,916 sq. ft.
- Electrical
- Lighting
- Fire alarm system
Notes:
This facility has an exquisite dining room and large meeting room. This hotel was constructed with foam and concrete exterior walls.
Grand Falls Resort & Casino with Golf Course
Owner:
Baxter Construction
Completed:
7/20/2011
Duration:
10 months
Scope:
- Installation of flywheel backup UPS System
- Installation of two backup generators
Notes
This project is the largest to date that Reliance has completed, and we completed it in record time. Along with the hotel and casino, this facility has other amenities such as: Golf Course, Golf Shop, The Spa, Gift Shop, RV Park, Pools, Pool Lounge, an event center, and four restaurants/cafés.